--- Page 1 --- Printed: 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls 360 East Elm Street Conshohocken, PA 19428 Marlin E. Buckley 888-419-7770 Managing Principal 866-899-7387 fax www.buckleypc.com MEBPC Project No. : 049-01602 Client: Bid Due Date: Address: Time: Delivery: Bid Type: Labor: Phone: Fax: Estimator: MEB Owner: Phone: Fax: Project: Calculated Base Bid Total: Final Base Bid: Bid Documents: Total Square Footage: Cost Per Square Foot: I have made a careful review of the attached estimate and hereby authorize release of the bid. Date: Very Reputable General Contractor Architects, and other Construction Professionals $192 Technical Support Services for Contractors, Owners, Attorneys, Plans, Specs, Addenda 1 through 4 Addendum #5 91,100 Academic Institution $17,494,401 $17,450,000 New Facilities Union Estimate for General Construction Marlin E. Buckley, P.C.® Building Experts August 8, 2006Very Reputable General Contractor BASELINE 2.0 3:00 PM Hand Deliver Stipulated Sum --- Page 2 --- Printed: 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls CSI Trade Division General Requirements $502,150 Site Work $1,844,280 Concrete $1,199,410 Masonry $522,989 Metals $933,478 Wood & Plastics $259,333 Moisture & Thermal Control $409,098 Doors, Windows, & Glazing $557,124 Finishes $1,735,660 Specialties $140,293 Equipment $49,349 Furnishings $0 Special Construction $1,724,369 Conveying Systems $50,000 Mechanical $3,337,567 Electrical $2,773,039 TOTAL DIRECT COSTS: $16,038,138 GC FEE: $1,283,051 TOTAL BASE ESTIMATE: $17,321,189 BUILDER'S CONTINGENCY: $0 subtotal: $17,321,189 Performance & Payment Bonds: $173,212 CALCULATED GRAND TOTAL : $17,494,401 Base Bid Summary General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 2 of 47 --- Page 3 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY 2201 EXCAVATION $1,403,308 Subcontract 1 bid Bidders: Quantity Survey: Survey and Layout 1 LS 25,000.00 $25,000 $25,000 As-Built Drawings 1 LS 10,000.00 $10,000 $10,000 Erosion and Sediment Control: Silt Fence 1200 LF 1.55 $1,860 $1,860 Inlet Protection 12 EA 310.00 $3,720 $3,720 Construction Entrance 2 EA Stone 100 TN 23.25 $2,325 $2,325 Fabric 300 SY 1.55 $465 $465 Backhoe with Operating Engineer 5 DAY 1000 $5,000 $5,000 Medium Dozer with Operating Engineer 1 DAY 1200 $1,200 $1,200 Laborer 96 HRS 65.00 $6,240 $6,240 Foreman 48 HRS 75.00 $3,600 $3,600 Demolition: Relocate Traffic Signs 2 EA Transplant Trees 9 EA Tree Protection Fence 1800 LF 3.10 $5,580 $5,580 Backhoe with Operating Engineer 9 DAY 1,000.00 $9,000 $9,000 Laborer 144 HRS 65.00 $9,360 $9,360 Foreman 72 HRS 75.00 $5,400 $5,400 Remove Asphalt 1200 SY Excavator with Operating Engineer 1 DAY 1,500.00 $1,500 $1,500 Dumptruck with Driver 3 DAY 650.00 $1,950 $1,950 Laborer 8 HRS 65.00 $520 $520 Foreman 8 HRS 75.00 $600 $600 Dumping Fees 15 LDS 100.00 $1,500 $1,500 Remove Fence Foundations 46 EA Excavator with Operating Engineer 1 DAY 1,500.00 $1,500 $1,500 Dumptruck with Driver 1 DAY 650.00 $650 $650 Laborer 8 HRS 65.00 $520 $520 Foreman 8 HRS 75.00 $600 $600 Dumping Fees 2 LDS 100.00 $200 $200 Earthwork: Stip Topsoil and Stock for Re-spread 1453 CY Medium Dozer with Operating Engineer 2 DAY 1,200.00 $2,400 $2,400 Medium Loader with Operating Engineer 2 DAY 1,200.00 $2,400 $2,400 Dumptruck with Driver 6 DAY 650.00 $3,900 $3,900 Laborer 16 HRS 65.00 $1,040 $1,040 Foreman 16 HRS 75.00 $1,200 $1,200 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 3 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 4 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Basin Excavation 1500 CY Excavator w/Operator 3 DAY 1,500.00 $4,500 $4,500 Dumptruck with Driver 23 DAY 600.00 $13,800 $13,800 Laborer 24 HRS 65.00 $1,560 $1,560 Foreman 24 HRS 75.00 $1,800 $1,800 Dumping Fees 115 LDS 100.00 $11,500 $11,500 Site Cut to Fill 8737 CY Excavator with Operating Engineer 8 DAY 1,500.00 $12,000 $12,000 Dumptruck with Driver 45 DAY 650.00 $29,250 $29,250 Medium Dozer with Operating Engineer 8 DAY 1,200.00 $9,600 $9,600 Compactor with Operating Engineer 8 DAY 900.00 $7,200 $7,200 Laborer 64 HRS 65.00 $4,160 $4,160 Foreman 64 HRS 75.00 $4,800 $4,800 Site Cut to Dispose Off Site 3283 CY Excavator with Operating Engineer 5 DAY 1,500.00 $7,500 $7,500 Dumptruck with Driver 50 DAY 650.00 $32,500 $32,500 Laborer 40 HRS 65.00 $2,600 $2,600 Foreman 40 HRS 75.00 $3,000 $3,000 Dumping Fees 252 LDS 100.00 $25,200 $25,200 Respread Topsoil: Respread Topsoil from On Site Stockpile 1453 CY Medium Loader with Operating Engineer 12 DAY 1,200.00 $14,400 $14,400 Medium Dozer with Operating Engineer 12 DAY 1,200.00 $14,400 $14,400 Backhoe with Operating Engineer 12 DAY 1,000.00 $12,000 $12,000 Dumptruck with Driver 12 DAY 650.00 $7,800 $7,800 Laborer 288 HRS 65.00 $18,720 $18,720 Foreman 96 HRS 75.00 $7,200 $7,200 Site Utilities: Sanitary Sewer 8" CIP SV 250 LF 29.45 $7,363 $7,363 Fittings 1 LS 1,000.00 $1,000 $1,000 Trap & FAI 1 EA 2,325.00 $2,325 $2,325 Stone Bedding 100 TON 23.25 $2,325 $2,325 Shoring 1 LS 2,000.00 $2,000 $2,000 Traffic Protection 1 LS 2,000.00 $2,000 $2,000 Excavator with Operating Engineer 5 DAY 1,500.00 $7,500 $7,500 Medium Loader with Operating Engineer 5 DAY 1,200.00 $6,000 $6,000 Dumptruck with Driver 5 DAY 650.00 $3,250 $3,250 Laborer 80 HRS 65.00 $5,200 $5,200 Plumber Labor 40 HRS 96.00 $3,840 $3,840 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 4 of 47 Construction Estimate Sample – Marlin Buckley, PC Stip and Haul Excess Topsoil Off Site 3377 CY Medium Dozer with Operating Engineer 5 DAY 1,200.00 $6,000 $6,000 Medium Loader with Operating Engineer 5 DAY 1,200.00 $6,000 $6,000 Dumptruck with Driver 52 DAY 600.00 $31,200 $31,200 Laborer 40 HRS 65.00 $2,600 $2,600 Foreman 40 HRS 75.00 $3,000 $3,000 Dumping Fees 260 LDS 100.00 $26,000 $26,000 --- Page 5 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Storm Sewer 4" CIP 259 LF 10.85 $2,810 $2,810 8" CIP 226 LF 29.45 $6,656 $6,656 10" CIP 186 LF 48.05 $8,937 $8,937 12" CIP 419 LF 69.75 $29,225 $29,225 18" RCP 172 LF 23.25 $3,999 $3,999 21" RCP 128 LF 28.06 $3,591 $3,591 24" RCP 850 LF 31.00 $26,350 $26,350 CIP Fittings 1 LS 9,500.00 $9,500 $9,500 RCP Fittings 1 LS 3,500.00 $3,500 $3,500 Stone Bedding 900 TON 23.25 $20,925 $20,925 Trench Box 1 LS 2,000.00 $2,000 $2,000 Excavator with Operating Engineer 35 DAY 1,500.00 $52,500 $52,500 Medium Loader with Operating Engineer 35 DAY 1,200.00 $42,000 $42,000 Dumptruck with Driver 35 DAY 650.00 $22,750 $22,750 Laborer 560 HRS 65.00 $36,400 $36,400 Plumber Labor 280 HRS 96.00 $26,880 $26,880 Storm Structures Inlets 9 EA 2,790.00 $25,110 $25,110 Manoles 6 EA 3,875.00 $23,250 $23,250 Endwalls 3 EA 1,550.00 $4,650 $4,650 Rip-Rap Aprons 60 TON 23.25 $1,395 $1,395 Excavator with Operating Engineer 18 DAY 1,500.00 $27,000 $27,000 Medium Loader with Operating Engineer 18 DAY 1,200.00 $21,600 $21,600 Dumptruck with Driver 18 DAY 650.00 $11,700 $11,700 Laborer 288 HRS 65.00 $18,720 $18,720 Plumber Labor 144 HRS 96.00 $13,824 $13,824 Water Service 4" DIP Domestic 585 LF 23.25 $13,601 $13,601 Fittings 1 LS 2,000.00 $2,000 $2,000 Concrete 3 CY 150.00 $450 $450 Stone Bedding 150 TON 23.25 $3,488 $3,488 Excavator with Operating Engineer 8 DAY 1,500.00 $12,000 $12,000 Medium Loader with Operating Engineer 8 DAY 1,200.00 $9,600 $9,600 Dumptruck with Driver 8 DAY 650.00 $5,200 $5,200 Laborer 128 HRS 65.00 $8,320 $8,320 Plumber Labor 64 HRS 96.00 $6,144 $6,144 Water Service 8" DIP Domestic 575 LF 38.75 $22,281 $22,281 Fittings 1 LS 2,500.00 $2,500 $2,500 Concrete 3 CY 150.00 $450 $450 Stone Bedding 150 TON 23.25 $3,488 $3,488 Excavator with Operating Engineer 8 DAY 1,500.00 $12,000 $12,000 Medium Loader with Operating Engineer 8 DAY 1,200.00 $9,600 $9,600 Dumptruck with Driver 8 DAY 650.00 $5,200 $5,200 Laborer 128 HRS 65.00 $8,320 $8,320 Plumber Labor 64 HRS 96.00 $6,144 $6,144 Allowance: Water Permits 1 LS 30,000.00 $30,000 $30,000 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 5 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 6 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Allowance: Water Meter Pit 1 LS 15,000.00 $15,000 $15,000 Addendum #5: Additonal Fire Hydrant 1 EA 4,000.00 $4,000 $4,000 Additional 500 CY cut to haul 1 LS 11,000.00 $11,000 $11,000 Block Retaining Walls: Retaining Wall Subconttractor 2600 SF 35.00 $91,000 $91,000 Excavator with Operating Engineer 5 DAY 1,500.00 $7,500 $7,500 Dumptruck with Driver 5 DAY 650.00 $3,250 $3,250 Laborer 40 HRS 65.00 $2,600 $2,600 Foreman 40 HRS 75.00 $3,000 $3,000 Site Concrete: Concrete Curbs 4500 LF Concrete 187 CY 150.00 $28,050 $28,050 Backhoe with Operating Engineer 15 DAY 1,000.00 $15,000 $15,000 Laborer 120 HRS 65.00 $7,800 $7,800 Foreman 120 HRS 75.00 $9,000 $9,000 Cement Finisher 240 HRS 75.00 $18,000 $18,000 Cement Finisher Foreman 120 HRS 85.00 $10,200 $10,200 Sidewalk 10965 SF Concrete 147 CY 150.00 $22,050 $22,050 Stone 227 TON 23.25 $5,278 $5,278 Backhoe with Operating Engineer 10 DAY 1,000.00 $10,000 $10,000 Laborer 80 HRS 65.00 $5,200 $5,200 Foreman 80 HRS 75.00 $6,000 $6,000 Cement Finisher 160 HRS 75.00 $12,000 $12,000 Cement Finisher Foreman 80 HRS 85.00 $6,800 $6,800 Chain Link Fencing: Subcontract 1 bid Bidders: Quantity Survey: Fencing at site 480 LF 30.00 $14,400 $14,400 Double Gates 1 EA 1,200.00 $1,200 $1,200 Fending at pads 310 LF 30.00 $9,300 $9,300 Single Gates with Panic Hardware 4 EA 1,200.00 $4,800 $4,800 Illuminated Site Signage: Subcontract 1 bid Bidders: General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 6 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 7 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Quantity Survey: Lighted Sign 1 EA 2,500.00 $2,500 $2,500 2500 PAVING $338,981 Subcontract 1 bid Bidders: Quantity Survey: Light Duty Paving 9200 SY Stone Base, 6" Thick 2606 TON 23.25 $60,590 $60,590 ID-2 Binder Course, 1-1/2" Thick 795 TON 66.65 $52,987 $52,987 ID-2 Wearing Course, 1-1/2" Thick 830 TON 69.75 $57,893 $57,893 Medium Dozer with Operating Engineer 6 DAY 1,200.00 $7,200 $7,200 Compactor with Operating Engineer 6 DAY 1,000.00 $6,000 $6,000 Large Paver 5 DAY 1,600.00 $8,000 $8,000 Asphalt Roller 10 DAY 900.00 $9,000 $9,000 Dumptruck with Driver 19 DAY 650.00 $12,350 $12,350 Laborer 352 HRS 65.00 $22,880 $22,880 Foreman 88 HRS 75.00 $6,600 $6,600 Heavy Duty Paving 2688 SY Stone Base, 6" Thick 760 TON 23.25 $17,670 $17,670 ID-2 Binder Course 390 TON 66.65 $25,994 $25,994 ID-2 Wearing Course 245 TON 69.75 $17,089 $17,089 Medium Dozer with Operating Engineer 2 DAY 1,200.00 $2,400 $2,400 Compactor with Operating Engineer 2 DAY 1,000.00 $2,000 $2,000 Large Paver 2 DAY 1,600.00 $3,200 $3,200 Asphalt Roller 4 DAY 900.00 $3,600 $3,600 Dumptruck with Driver 7 DAY 650.00 $4,550 $4,550 Laborer 128 HRS 65.00 $8,320 $8,320 Foreman 32 HRS 75.00 $2,400 $2,400 Line Painting and Signs: Parking Stalls 256 EA 10.00 $2,560 $2,560 Signs 10 EA 500.00 $5,000 $5,000 Wheel Stops 7 EA 100.00 $700 $700 2900 LANDSCAPING $101,991 Subcontract 1 bid Bidders: General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 7 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 8 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Quantity Survey: Type IV Red Sperit 153 EA 22.90 $3,504 $3,504 Type Jh Creaping Juniper 224 EA 26.40 $5,914 $5,914 Type TB Spreading English Yew 252 EA 23.80 $5,998 $5,998 Type ZS Green Zelkova 33 EA 420.00 $13,860 $13,860 Type JE Soft Rush 983 SY 2.00 $1,966 $1,966 Labor 430 HRS 65.00 $27,950 $27,950 Fine Rake 88000 SF Laborer 80 HRS 65.00 $5,200 $5,200 Mulch 32000 SF 0.30 $9,600 $9,600 Laborer 80 HRS 65.00 $5,200 $5,200 Seed 88000 SF 0.20 $17,600 $17,600 Laborer 80 HRS 65.00 $5,200 $5,200 3000 CONCRETE $1,199,410 Subcontract 1 bid Bidders: Quantity Survey: Building Concrete: Grade Beams 388.94 CY Footings 172.23 CY Slab on Grade 1,256.88 CY Slab on Metal Deck 171.36 CY Piers 3.10 CY Walls 6.49 CY Poured in Place Stairs 1.16 CY Stair Treads & Landings 7.22 CY Total Concrete 2,007.38 CY 500.00 $1,003,690 $1,003,690 Misc Items (included in unit price, above) Re-bar 14.64 TN WWF 82,309 SF 10 Mil VB 80,652 SF CJ 14,361 LF Perimeter Rigid Insulation 3,972 LF General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 8 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 9 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Plywood Forms 544 SF Fiber Mesh 128 BG Building Excavation: Removal Grade Beams 805.69 CY Footings 292.36 CY Finish Grade to Slab Sub-Grade 1,243.74 CY Stairs & Walls 71.19 CY Total Removal 2,412.98 CY Backhoe with Operating Engineer 10 DAY 1,000.00 $10,000 $10,000 Excavator with Operating Engineer 10 DAY 1,500.00 $15,000 $15,000 Loader with Operating Engineer 10 DAY 1,500.00 $15,000 $15,000 Dumptruck with Driver 10 DAY 650.00 $6,500 $6,500 Laborer 160 HRS 65.00 $10,400 $10,400 Backfill Grade Beams 506.65 CY Footings 84.39 CY Stairs & Walls 57.73 CY Total Replacement 648.77 CY Backhoe with Operating Engineer 10 DAY 1,000.00 $10,000 $10,000 Excavator with Operating Engineer 10 DAY 1,500.00 $15,000 $15,000 Loader with Operating Engineer 10 DAY 1,500.00 $15,000 $15,000 Dumptruck with Driver 10 DAY 650.00 $6,500 $6,500 Laborer 160 HRS 65.00 $10,400 $10,400 Spoil Export Slab Grading - Excess Soils 1,243.74 CY Loader with Operating Engineer 5 DAY 1,500.00 $7,500 $7,500 Dumptruck with Driver 20 DAY 650.00 $13,000 $13,000 Dumping Fees 95 EA 75.00 $7,125 $7,125 Stone Placement: Stone (delivered) 1,745.00 TN 19.00 $33,155 $33,155 Loader with Operating Engineer 5 DAY 1,500.00 $7,500 $7,500 Carpentry Labor 40 HRS 81.00 $3,240 $3,240 Laborer 160 HRS 65.00 $10,400 $10,400 4000 MASONRY $522,989 Subcontract 1 bid Bidders: General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 9 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 10 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Quantity Survey: Brick Facing A301 Elevation 1 391 SF 23.00 $8,993 $8,993 Elevation 4 2040 SF 23.00 $46,920 $46,920 A302 Elevation 1 3420 SF 23.00 $78,660 $78,660 A303 Elevation 1 4290 SF 23.00 $98,670 $98,670 Elevation 2 4290 SF 23.00 $98,670 $98,670 Plan Sections 4, 5, 6/ S101 342 SF 23.00 $7,866 $7,866 8'' Ground Face CMU 2288 SF 25.00 $57,200 $57,200 12'' Ground Face CMU Plan Section 1/A506 167 SF 30.00 $5,010 $5,010 Plan Section 1/A507 474 SF 30.00 $14,220 $14,220 4/S102 Split Face Block (Mechanical Enclosure) 500 SF 25.00 $12,500 $12,500 8'' CMU Plan Sections 4, 5, 6/ S101 456 SF 14.00 $6,384 $6,384 Plan Sections 4, 5, 6/ S101 192 SF 14.00 $2,688 $2,688 Plan Sections 1/ S101 153 SF 14.00 $2,142 $2,142 Plan Sections 1/ S101 192 SF 14.00 $2,688 $2,688 Plan Sections 1A/ S101 87 SF 14.00 $1,218 $1,218 16/S501 Elevation Shaft 1280 SF 14.00 $17,920 $17,920 4/S505 Boiler Room 910 SF 14.00 $12,740 $12,740 4/S505 Boiler Room 3185 SF 14.00 $44,590 $44,590 12'' CMU Plan Section 2/S103 30 SF 17.00 $510 $510 Plan Section 4/S102 200 SF 17.00 $3,400 $3,400 5000 METALS $933,478 Subcontract 1 bid Bidders: Quantity Survey: Structural Steel: Columns 35.20 TN Beams 83.11 TN HSS Steel - (inc Plates & Gussets) 33.48 TN Bar Joists 35.02 TN Plates & Angles 18.48 TN General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 10 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 11 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Total Structural Steel 205.29 TN 3,100.00 $636,399 $636,399 Metal Deck 9/16" x Corrugated Metal Deck 15,739 SF 2.25 $35,413 $35,413 1 1/2" x 20 GA Metal Deck 19,315 SF 2.50 $48,288 $48,288 2" x 18 GA Metal Deck 596 SF 2.75 $1,639 $1,639 Pre Stressed Concrete Plank 450 SF 30.00 $13,500 $13,500 Miscellaneous Metals: Stair w/ Landing (including railings) 2 EA 30,000.00 $60,000 $60,000 Stair (to mezzanine, with rails) 2 EA 7,500.00 $15,000 $15,000 Stairs (main entry, with architectural railings) 1 EA 30,000.00 $30,000 $30,000 Ladder 1 EA 3,500.00 $3,500 $3,500 Loose Lintels 1.32 TN 2,000.00 $2,640 $2,640 Attachments (anchor bolts, etc.) 1,670.00 EA 50.00 $83,500 $83,500 Pipe Railings, double rail 40 LF 90.00 $3,600 $3,600 6000 CARPENTRY $88,889 Subcontract 1 bid Bidders: Quantity Survey: Roof Wood Blocking 18,19, 20/A122 Perimeter Blocking 2X6 PT 2888 LF 1.24 $3,581 $3,581 7/A121 Curb Blocking 2X6 PT 120 LF 1.24 $149 $149 2/A121 Knee Wall Blocking 2X6 PT 112 LF 1.24 $139 $139 Knee Wall Blocking 2X10 PT 224 LF 2.01 $450 $450 Roof Hatch Blocking 2X6 PT 32 LF 1.24 $40 $40 20/A122 Parapet Cap 1X10 PT 386 LF 1.20 $463 $463 Parapet Cap 2X4 PT 772 LF 0.77 $594 $594 15,16/ A122 Blocking 2X8 PT 222 LF 1.70 $377 $377 Blocking 2X6 PT 444 LF 1.24 $551 $551 Blocking 2X4 PT 444 LF 0.77 $342 $342 10/A122 Blocking 2X6 PT 144 LF 1.24 $179 $179 Fasteners 1 LS 150.00 $150 $150 Carpentry Labor 92 HRS 81.00 $7,452 $7,452 Wood Blocking for Cabinetry Base 2X4 161 LF 0.53 $85 $85 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 11 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 12 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Wall 2X4 150 LF 0.53 $80 $80 P-Lam Shelving 2X4 114 LF 0.53 $60 $60 Fasteners 1 LS 21.00 $21 $21 Carpentry Labor 29 HRS 81.00 $2,349 $2,349 Wood Blocking A702 Tops 2X4 246 LF 0.53 $130 $130 6,7/ A801 Framing 2X4 250 LF 0.53 $133 $133 Fasteners 1 LS 24.00 $24 $24 Carpentry Labor 10 HRS 81.00 $810 $810 Framing Type 8 Walls 2X4 4496 LF 0.53 $2,383 $2,383 Type 9 Walls 2X4 512 LF 0.53 $271 $271 2/A802 1'' Plywood 964 SF 1.70 $1,639 $1,639 2X8 252 LF 1.08 $272 $272 2X10 434 LF 1.68 $729 $729 2X12 644 LF 2.48 $1,597 $1,597 4X4 376 LF 1.72 $647 $647 Joist Hangers 172 EA 2.53 $435 $435 Bridging 99 Pair 198 EA 1.89 $374 $374 Railing 2X4 1190 LF 0.53 $631 $631 Stair Flights 7 EA 500.00 $3,500 $3,500 Fasteners 1 LS 463.00 $463 $463 Carpentry Labor 120 HRS 81.00 $9,720 $9,720 T112D 1'' Plywood 560 SF 1.70 $952 $952 2X12 748 LF 2.48 $1,855 $1,855 4X4 104 LF 1.72 $179 $179 Joist Hangers 80 EA 2.53 $202 $202 Bridging 41 Pair 82 EA 1.89 $155 $155 Stair Flights 1 EA 500.00 $500 $500 Railing 2X4 468 LF 0.53 $248 $248 Fasteners 1 LS 75.00 $75 $75 Carpentry Labor 29 HRS 81.00 $2,349 $2,349 A101 Blocking for LCD's Note 13 3/4'' Plywood 134 SF 1.28 $172 $172 Carpentry Labor 25 HRS 81.00 $2,025 $2,025 Blocking for Toilet Compartments 2X4 212 LF 0.53 $112 $112 Blocking for Toilet Accessories 2X4 72 LF 0.53 $38 $38 Blocking for Marker Boards, Tack Boards, Tack Strips and Projection Screens 2X4 1527 LF 0.53 $809 $809 Carpentry Labor 102 HRS 81.00 $8,262 $8,262 A908 Blocking at P1, P2, P3, L1 (Details 1, 2, 3, 4, 5) 2X12 PT 822 LF 2.60 $2,137 $2,137 2X8 PT 2938 LF 1.70 $4,995 $4,995 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 12 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 13 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY 2X4 PT 3760 LF 0.77 $2,895 $2,895 Fasteners 1 LS 376.00 $376 $376 Carpentry Labor 140 HRS 81.00 $11,340 $11,340 A908 Blocking W1, W2, W3, W4, W5 (Details 7, 8, 9) 1X6 PT 1524 LF 0.95 $1,448 $1,448 2X6 PT 1524 LF 1.24 $1,890 $1,890 Fasteners 1 LS 153.00 $153 $153 Carpentry Labor 48 HRS 81.00 $3,888 $3,888 11/A908 Store Front Blocking 2X8 PT 142 LF 1.70 $241 $241 2X4 PT 142 LF 0.77 $109 $109 Fasteners 1 LS 15.00 $15 $15 Carpentry Labor 8 HRS 81.00 $648 $648 6400 CABINETRY, CASEWORK, CUSTOM MILLWORK $170,444 Vendor, F & D w T 1 bid Labor to install See Below HRS 81.00 Bidders: Quantity Survey: A701 Cabinet Types 1 9 EA 750.00 $1,500 $1,500 2 4 EA 750.00 $2,250 $2,250 3E A 4 6 EA 625.00 $3,125 $3,125 5 36 EA 625.00 $3,750 $3,750 6 1 EA 625.00 $4,375 $4,375 7 1 EA 375.00 $3,000 $3,000 8 1 EA 313.00 $2,817 $2,817 9 1 EA 313.00 $3,130 $3,130 10 1 EA 313.00 $3,443 $3,443 11 4 EA 1,800.00 $21,600 $21,600 12 19 EA 500.00 $6,500 $6,500 13 2 EA 250.00 $3,500 $3,500 14 6 EA 500.00 $7,500 $7,500 15 1 EA 600.00 $9,600 $9,600 16 2 EA 900.00 $1,800 $1,800 P-Lam Tops 510 LF 50.00 $25,500 $25,500 P-Lam Shelving 57 LF 200.00 $11,400 $11,400 Carpenter Labor 133 HRS 81.00 $10,773 $10,773 A702 Tops 313 SF 45.00 $14,085 $14,085 3A/A7026'' Wood Cap at Rm T104 18 LF 1.75 $32 $32 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 13 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 14 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Carpenter Labor 18 HRS 81.00 $1,458 $1,458 A801 Reception Desk Top 31 SF 45.00 $1,395 $1,395 File Cabinets 3 LF 250.00 $750 $750 Wall Behind Reception Desk 1/2'' Oak Veneer 169 SF 3.63 $613 $613 1X4 Oak Furring 108 LF 1.10 $119 $119 Carpenter Labor 20 HRS 81.00 $1,620 $1,620 A908 MDF Trim Board (Includes 7A & 7B/A907) P1 938 SF 1.06 $994 $994 P2 2925 SF 1.06 $3,101 $3,101 P3 1305 SF 1.06 $1,383 $1,383 L1 585 SF 1.06 $620 $620 Carpentry Labor 231 HRS 81.00 $18,711 $18,711 7200 INSULATION $71,095 Subcontract 1 bid Bidders: Quantity Survey: Insulation at Ground Face Block at Perimeter of Trades Building A503, A504, A505, A506 3 1/2 Fiberglass Batt 2288 SF 0.35 $801 $801 Carpentry Labor 12 HRS 81.00 $972 $972 A905 Acoustic Deck 7992 SF 5.00 $39,960 $39,960 Carpentry Labor 140 HRS 81.00 $11,340 $11,340 6 Inch Fiberglass Insulation Wall Types 7A 11774 SF 0.72 $8,477 $8,477 7B 3132 SF 0.72 $2,255 $2,255 Carpentry Labor 90 HRS 81.00 $7,290 $7,290 7300 ROOFING & SHEETMETAL $313,003 Subcontract 1 bid Bidders: General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 14 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 15 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Quantity Survey: EPDM Roofing 26163 SF 4.50 $117,734 $117,734 1/2'' Fiber Board 26163 SF 1.50 $39,245 $39,245 3'' Rigid Insulation 26163 SF 4.50 $117,734 $117,734 Sheet Metal 20/A122 At Brick 386 LF 15.00 $5,790 $5,790 9 1/2'' High Fascia 386 LF 15.00 $5,790 $5,790 16/A122 Aluminum Fascia 111 LF 15.00 $1,665 $1,665 Soffit 611 SF 7.00 $4,277 $4,277 15/A122 Aluminum Drip Edge 111 LF 10.00 $1,110 $1,110 Soffit 167 SF 7.00 $1,169 $1,169 Galvanized Gutter 111 LF 20.00 $2,220 $2,220 18,19/ A122 Fascia 176 LF 15.00 $2,640 $2,640 Fascia at High Roof 160 LF 15.00 $2,400 $2,400 Metal Coping at Mechanical Enclosures 50 LF 25.00 $1,250 $1,250 Walk Pads 104 LF 25.00 $2,600 $2,600 Roof Hatch 1 EA 1,000.00 $1,000 $1,000 A505 Resolite Translucent Roofling T115 418 SF 10.00 $4,180 $4,180 T117F 220 SF 10.00 $2,200 $2,200 7900 SEALANTS $25,000 Subcontract 1 bid Bidders: Quantity Survey: Caulking 1 LS 25,000.00 $25,000 $25,000 8100 DOORS, FRAMES, & HARDWARE $180,910 Vendor, F & D w T 1 bid Labor to install 535 HRS 81.00 $43,335 $43,335 Bidders: General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 15 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 16 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Quantity Survey: Key Cabinets 1 EA 350.00 $350 $350 Door Slabs Wood (Pre-Finished) Type 1 94 EA 250.00 $23,500 $23,500 Wood (Pre-Finished) Type 2 75 EA 250.00 $18,750 $18,750 HM Door Over-Sized 12 EA 225.00 $2,700 $2,700 HM Frames Single Door 66 EA 150.00 $9,900 $9,900 Double Door 16 EA 175.00 $2,800 $2,800 Single w/ 2 Windows 11 EA 225.00 $2,475 $2,475 Single w/ 3 Windows 1 EA 250.00 $250 $250 Single w/ 1 Full Lite 55 EA 200.00 $11,000 $11,000 Single w/ 3 Full Lites 5 EA 400.00 $2,000 $2,000 Window Double 12 EA 150.00 $1,800 $1,800 2 Full Lites 2 EA 225.00 $450 $450 3 Full Lites 2 EA 300.00 $600 $600 4 Full Lites 2 EA 400.00 $800 $800 Hardware Sets 181 EA 200.00 $36,200 $36,200 OH Coiling Doors OH Doors 4 EA 6,000.00 $24,000 $24,000 OH Coiling Grille NONE FOUND 8400 WINDOWS & STOREFRONT $376,214 Subcontract 1 bid Bidders: Quantity Survey: L1 Louvers, windows P1, P2, and P3 are supplied by metal building manufacturer Glass and Glazing Door Glazing Type B & C 344 SF 10.00 $3,440 $3,440 Type D 192 SF 10.00 $1,920 $1,920 Type E 14 SF 10.00 $140 $140 Type F 9 SF 10.00 $90 $90 HM Frame Glazing General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 16 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 17 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Full Lite 1653 SF 10.00 $16,530 $16,530 Windows 539 SF 10.00 $5,390 $5,390 Windows W1 17 EA 250.00 $4,250 $4,250 W2 12 EA 300.00 $3,600 $3,600 W3 19 EA 325.00 $6,175 $6,175 W4 14 EA 350.00 $4,900 $4,900 W5 3 EA 250.00 $750 $750 Carpenter Labor 124 HRS 81.00 $10,044 $10,044 Aluminum Store Front A904 1400 SF 30.00 $42,000 $42,000 A904 557 SF 30.00 $16,710 $16,710 A904 Doors 3 EA 1,800.00 $5,400 $5,400 Aluminum Curtain Wall C1/A906 4193 SF 35.00 $146,755 $146,755 C2/A906 976 SF 35.00 $34,160 $34,160 C3/A906 1109 SF 35.00 $38,815 $38,815 C4/A906 666 SF 35.00 $23,310 $23,310 C5/A906 81 SF 35.00 $2,835 $2,835 Doors 5 EA 1,800.00 $9,000 $9,000 9250 DRYWALL & METAL STUDS $1,112,553 Subcontract 1 bid Bidders: Quantity Survey: GWB Wall Type 1 82168 SF 0.65 $53,409 $53,409 1B 19082 SF 0.65 $12,403 $12,403 1C 5553 SF 0.65 $3,609 $3,609 1D 2786 SF 0.65 $1,811 $1,811 2 19344 SF 0.65 $12,574 $12,574 2B 49764 SF 0.65 $32,347 $32,347 2C 59725 SF 0.65 $38,821 $38,821 3 17342 SF 0.65 $11,272 $11,272 3A 5422 SF 0.65 $3,524 $3,524 3B 3712 SF 0.65 $2,413 $2,413 5A 1885 SF 0.65 $1,225 $1,225 7A 11774 SF 0.65 $7,653 $7,653 7B 3132 SF 0.65 $2,036 $2,036 10 4230 SF 0.65 $2,750 $2,750 11 570 SF 0.65 $371 $371 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 17 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 18 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Carpentry Labor 1994 HRS 81.00 $161,514 $161,514 Finish Drywall Subcontractor 286489 SF 0.60 $171,893 $171,893 GPF Wall Type 1B 9541 SF 1.40 $13,357 $13,357 2B 21744 SF 1.40 $30,442 $30,442 2C 12816 SF 1.40 $17,942 $17,942 Carpentry Labor 307 HRS 81.00 $24,867 $24,867 Metal Stud Framing Hat Channel Wall Type 5A 1885 LF 0.31 $584 $584 2 1/2 Stud Wall Type 11 570 LF 0.55 $314 $314 3 5/8 Stud Wall Type 1 41084 LF 0.65 $26,705 $26,705 1B 9541 LF 0.65 $6,202 $6,202 1C 5553 LF 0.65 $3,609 $3,609 1D 2786 LF 0.65 $1,811 $1,811 3 8671 LF 0.65 $5,636 $5,636 3B 3712 LF 0.65 $2,413 $2,413 7B 3132 LF 0.65 $2,036 $2,036 6'' Stud Wall Type 2 9692 LF 0.93 $9,014 $9,014 2B 24882 LF 0.93 $23,140 $23,140 2C 29725 LF 0.93 $27,644 $27,644 3A 2711 LF 0.93 $2,521 $2,521 7A 11774 LF 0.93 $10,950 $10,950 7B 3132 LF 0.93 $2,913 $2,913 8'' Stud Wall Type 10 2115 LF 1.10 $2,327 $2,327 Carpentry Labor 4415 HRS 81.00 $357,615 $357,615 Ceilings A102 GWB 210 SF 0.65 $137 $137 Hat Channel 210 LF 0.31 $65 $65 A139 GWB 210 SF 0.65 $137 $137 Hat Channel 210 LF 0.31 $65 $65 A202 GWB 210 SF 0.65 $137 $137 Chicago Grid 210 SF 1.25 $263 $263 A225 GWB 210 SF 0.65 $137 $137 Chicago Grid 210 SF 1.25 $263 $263 T102 GWB 77 SF 0.65 $50 $50 Chicago Grid 77 SF 1.25 $96 $96 T107 GWB 2048 SF 0.65 $1,331 $1,331 Chicago Grid 2048 SF 1.25 $2,560 $2,560 Carpentry Labor 89 HRS 81.00 $7,209 $7,209 Finish Drywall Subcontractor 2965 SF 0.60 $1,779 $1,779 7/A603 GWB 108 SF 0.65 $70 $70 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 18 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 19 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY 8/A603 GWB 204 SF 0.65 $133 $133 9/A603 Stairs GWB 448 SF 0.65 $291 $291 1&2/ A702 GWB 34 SF 0.65 $22 $22 3/A702 GWB 90 SF 0.65 $59 $59 Carpentry Labor 7 HRS 81.00 $567 $567 Finish Drywall Subcontractor 884 SF 0.60 $530 $530 7/A603 Steel Studs 108 LF 0.65 $70 $70 8/A603 Steel Studs 204 LF 0.65 $133 $133 9/A603 Stairs Steel Studs 262 LF 0.65 $170 $170 1&2/ A702 Steel Studs 34 LF 0.65 $22 $22 3/A702 Steel Studs 45 LF 0.65 $29 $29 Carpentry Labor 18 HRS 81.00 $1,458 $1,458 Addendum #5: Item 6 2x8 Metal Stud 352 LF 2.36 $831 $831 5/8 inch Plywood 352 SF 1.30 $458 $458 Fasteners 1 LS 35.00 $35 $35 Carpenter Labor 22 HRS 81.00 $1,782 $1,782 9300 CERAMIC & QUARRY TILE $116,625 Subcontract 1 bid Bidders: Quantity Survey: Ceramic Tile Rooms T111 Floor 160 SF 12.00 $1,920 $1,920 T111 Wall 208 SF 12.00 $2,496 $2,496 T113 Floor 160 SF 12.00 $1,920 $1,920 T113 Wall 208 SF 12.00 $2,496 $2,496 T143 Floor 182 SF 12.00 $2,184 $2,184 T143 Wall 288 SF 12.00 $3,456 $3,456 T147 Floor 182 SF 12.00 $2,184 $2,184 T147 Wall 288 SF 12.00 $3,456 $3,456 A104 Floor 54 SF 12.00 $648 $648 A104 Wall 120 SF 12.00 $1,440 $1,440 A106 Floor 54 SF 12.00 $648 $648 A106 Wall 120 SF 12.00 $1,440 $1,440 A127 Floor 192 SF 12.00 $2,304 $2,304 A127 Wall 272 SF 12.00 $3,264 $3,264 A131 Floor 192 SF 12.00 $2,304 $2,304 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 19 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 20 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY A131 Wall 272 SF 12.00 $3,264 $3,264 A206 Floor 54 SF 12.00 $648 $648 A206 Wall 120 SF 12.00 $1,440 $1,440 A208 Floor 54 SF 12.00 $648 $648 A208 Wall 120 SF 12.00 $1,440 $1,440 A229 Floor 252 SF 12.00 $3,024 $3,024 A229 Wall 328 SF 12.00 $3,936 $3,936 A233 Floor 252 SF 12.00 $3,024 $3,024 A233 Wall 328 SF 12.00 $3,936 $3,936 Quarry Tile A100 Floor 2880 SF 15.00 $43,200 $43,200 A100 Base 172 LF 15.00 $2,580 $2,580 A154 Floor 403 SF 15.00 $6,045 $6,045 A154 Base 66 LF 15.00 $990 $990 Slate Window Stools Window W1 51 LF 35.00 $1,785 $1,785 Window W2 36 LF 35.00 $1,260 $1,260 Window W3 114 LF 35.00 $3,990 $3,990 Window W4 84 LF 35.00 $2,940 $2,940 Window W5 9 LF 35.00 $315 $315 9500 ACOUSTICAL CEILINGS $125,559 Subcontract 1 bid Bidders: Quantity Survey: Rooms T101 745 SF 3.00 $2,235 $2,235 T104 840 SF 3.00 $2,520 $2,520 T105 1075 SF 3.00 $3,225 $3,225 T109B 108 SF 3.00 $324 $324 T111 160 SF 3.00 $480 $480 T113 160 SF 3.00 $480 $480 T115B 108 SF 3.00 $324 $324 T116B 108 SF 3.00 $324 $324 T117B 90 SF 3.00 $270 $270 T119B 108 SF 3.00 $324 $324 T120B 108 SF 3.00 $324 $324 T122B 108 SF 3.00 $324 $324 T123B 108 SF 3.00 $324 $324 T126B 108 SF 3.00 $324 $324 T127 798 SF 3.00 $2,394 $2,394 T128B 108 SF 3.00 $324 $324 T130A 300 SF 3.00 $900 $900 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 20 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 21 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY T130B 165 SF 3.00 $495 $495 T131B 108 SF 3.00 $324 $324 T132A 126 SF 3.00 $378 $378 T132B 198 SF 3.00 $594 $594 T132C 154 SF 3.00 $462 $462 T133B 108 SF 3.00 $324 $324 T134 240 SF 3.00 $720 $720 T136 132 SF 3.00 $396 $396 T137 81 SF 3.00 $243 $243 T138 132 SF 3.00 $396 $396 T139 117 SF 3.00 $351 $351 T141 630 SF 3.00 $1,890 $1,890 T143 182 SF 3.00 $546 $546 T147 182 SF 3.00 $546 $546 T149 1886 SF 3.00 $5,658 $5,658 T157 570 SF 3.00 $1,710 $1,710 T158 396 SF 3.00 $1,188 $1,188 T159 280 SF 3.00 $840 $840 Admin 1st Fl 15513 SF 3.00 $46,539 $46,539 Admin 2nd Fl 15513 SF 3.00 $46,539 $46,539 9600 FLOORING $148,476 Subcontract 1 bid Bidders: Quantity Survey: VCT Rooms T101 745 SF 2.50 $1,863 $1,863 T104 840 SF 2.50 $2,100 $2,100 T105 1075 SF 2.50 $2,688 $2,688 T109B 108 SF 2.50 $270 $270 T115B 108 SF 2.50 $270 $270 T116B 108 SF 2.50 $270 $270 T117B 90 SF 2.50 $225 $225 T119B 108 SF 2.50 $270 $270 T120B 108 SF 2.50 $270 $270 T122B 108 SF 2.50 $270 $270 T123B 108 SF 2.50 $270 $270 T126B 108 SF 2.50 $270 $270 T127B 798 SF 2.50 $1,995 $1,995 T128B 108 SF 2.50 $270 $270 T130A 300 SF 2.50 $750 $750 T130B 165 SF 2.50 $413 $413 T131B 108 SF 2.50 $270 $270 T132A 126 SF 2.50 $315 $315 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 21 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 22 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY T132B 198 SF 2.50 $495 $495 T132C 154 SF 2.50 $385 $385 T133B 108 SF 2.50 $270 $270 T134 240 SF 2.50 $600 $600 T136 132 SF 2.50 $330 $330 T137 81 SF 2.50 $203 $203 T138 132 SF 2.50 $330 $330 T139 117 SF 2.50 $293 $293 T141 630 SF 2.50 $1,575 $1,575 T149 1886 SF 2.50 $4,715 $4,715 T157 570 SF 2.50 $1,425 $1,425 T158 396 SF 2.50 $990 $990 T159 280 SF 2.50 $700 $700 A101 35 SF 2.50 $88 $88 A116 143 SF 2.50 $358 $358 A118 88 SF 2.50 $220 $220 A119 959 SF 2.50 $2,398 $2,398 A125 25 SF 2.50 $63 $63 A129 35 SF 2.50 $88 $88 A135 25 SF 2.50 $63 $63 A141A 285 SF 2.50 $713 $713 A141B 231 SF 2.50 $578 $578 A200 450 SF 2.50 $1,125 $1,125 A204 72 SF 2.50 $180 $180 A221 130 SF 2.50 $325 $325 A227 999 SF 2.50 $2,498 $2,498 A231 40 SF 2.50 $100 $100 A102 Rubber Floor 90 SF 30.00 $2,700 $2,700 Rubber Treads 24 EA 50.00 $1,200 $1,200 A225 Rubber Floor 90 SF 30.00 $2,700 $2,700 Rubber Treads 24 EA 50.00 $1,200 $1,200 A100 Rubber Floor 36 SF 30.00 $1,080 $1,080 Rubber Treads 24 EA 50.00 $1,200 $1,200 Carpet Administrative 1st Floor 1426 SY 25.00 $35,650 $35,650 Administrative 2nd Floor 1523 SY 25.00 $38,075 $38,075 Vinyl Base Wall Type 1 5210 LF 2.25 $11,723 $11,723 1B 658 LF 2.25 $1,481 $1,481 1C 961 LF 2.25 $2,162 $2,162 1D 198 LF 2.25 $446 $446 2 958 LF 2.25 $2,156 $2,156 2B 1716 LF 2.25 $3,861 $3,861 2C 2050 LF 2.25 $4,613 $4,613 3 380 LF 2.25 $855 $855 3A 90 LF 2.25 $203 $203 3B 50 LF 2.25 $113 $113 5 330 LF 2.25 $743 $743 5A 130 LF 2.25 $293 $293 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 22 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 23 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY 7A 406 LF 2.25 $914 $914 7B 108 LF 2.25 $243 $243 8 9 10 282 LF 2.25 $635 $635 11 38 LF 2.25 $86 $86 9900 PAINT $232,447 Subcontract 1 bid Bidders: Quantity Survey: Boiler Room CMU Walls 2505 SF 0.65 $1,628 $1,628 3A/A7026'' Wood Cap 18 LF 1.00 $18 $18 HM Door Over-Sized 12 EA 50.00 $600 $600 HM Door Regular 7 EA 40.00 $280 $280 HM Frames Single Door 72 EA 40.00 $2,880 $2,880 Double Door 17 EA 50.00 $850 $850 Single w/ 2 Windows 11 EA 60.00 $660 $660 Single w/ 3 Windows 1 EA 70.00 $70 $70 Single w/ 1 Full Lite 55 EA 55.00 $3,025 $3,025 Single w/ 3 Full Lites 5 EA 85.00 $425 $425 Window Double 12 EA 50.00 $600 $600 2 Full Lites 2 EA 60.00 $120 $120 3 Full Lites 2 EA 75.00 $150 $150 4 Full Lites 2 EA 85.00 $170 $170 Seal Concrete Floors 40245 SF 1.00 $40,245 $40,245 Wall Type 1 82168 SF 0.60 $49,301 $49,301 1B 19082 SF 0.60 $11,449 $11,449 1C 5553 SF 0.60 $3,332 $3,332 1D 2786 SF 0.60 $1,672 $1,672 2 19344 SF 0.60 $11,606 $11,606 2B 49764 SF 0.60 $29,858 $29,858 2C 59725 SF 0.60 $35,835 $35,835 3 17342 SF 0.60 $10,405 $10,405 3A 5422 SF 0.60 $3,253 $3,253 3B 3712 SF 0.60 $2,227 $2,227 5A 1885 SF 0.60 $1,131 $1,131 7A 11774 SF 0.60 $7,064 $7,064 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 23 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 24 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY 7B 3132 SF 0.60 $1,879 $1,879 10 4230 SF 0.60 $2,538 $2,538 11 570 SF 0.60 $342 $342 Ceiling 2965 SF 0.60 $1,779 $1,779 7/A603 GWB 108 SF 0.60 $65 $65 8/A603 GWB 204 SF 0.60 $122 $122 9/A603 Stairs GWB 448 SF 0.60 $269 $269 1&2/ A702 GWB 34 SF 0.60 $20 $20 3/A702 GWB 90 SF 0.60 $54 $54 A905 Steel Frame - 8'' Wide 513 SF 1.50 $770 $770 A908 MDF Board P1 938 SF 1.00 $938 $938 P2 2925 SF 1.00 $2,925 $2,925 P3 1305 SF 1.00 $1,305 $1,305 L1 585 SF 1.00 $585 $585 10000 SPECIALTIES $140,293 Toilet Partitions Vendor, F & D w T 1 bid Labor to install 75 HRS 81.00 $6,075 $6,075 Bidders: Quantity Survey: Toilet Compartments (HD Solid Polyethylene) A127 Stall 3 EA 1,500.00 $4,500 $4,500 A131 Urinal 1 EA 300.00 $300 $300 Stall 2 EA 1,500.00 $3,000 $3,000 A229 Stall 5 EA 1,500.00 $7,500 $7,500 A233 Urinal 2 EA 300.00 $600 $600 Stall 3 EA 1,500.00 $4,500 $4,500 T111 Urinal 1 EA 300.00 $300 $300 Stall 2 EA 1,500.00 $3,000 $3,000 T113 Stall 3 EA 1,500.00 $4,500 $4,500 T143 Urinal 1 EA 300.00 $300 $300 Stall 2 EA 1,500.00 $3,000 $3,000 T147 Stall 4 EA 1,500.00 $6,000 $6,000 Toilet Accessories Vendor, F & D w T 1 bid General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 24 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 25 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Labor to install 48 HRS 81.00 $3,888 $3,888 Bidders: Quantity Survey: Type 1 30'' Grab Bar 12 EA 75.00 $900 $900 1 36'' Grab Bar 12 EA 85.00 $1,020 $1,020 2 Mirror (1-8 x 2-6) 14 EA 85.00 $1,190 $1,190 3 Paper Towel Dispenser 12 EA 75.00 $900 $900 4 Napkin Disposal 15 EA 45.00 $675 $675 5 Waste Receptacle 12 EA 150.00 $1,800 $1,800 6 Tampon Vendor 4 EA 450.00 $1,800 $1,800 7 Toilet Paper Dispenser 28 EA 50.00 $1,400 $1,400 8 Soap Dispenser 22 EA 50.00 $1,100 $1,100 9 Full Height Mirror 12 EA 250.00 $3,000 $3,000 Fire Extinguishers Vendor, F & D w T 1 bid Labor to install 15 HRS 81.00 $1,215 $1,215 Bidders: Quantity Survey: Fire Extinguishers 10 EA 85.00 $850 $850 Extinguisher Cabinets 10 EA 200.00 $2,000 $2,000 Architectural Louvers Vendor, F & D w T 1 bid Labor to install HRS 81.00 Bidders: Quantity Survey: In Manufacturered Building Marker & Tack Boards, Projection Screens General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 25 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 26 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Vendor, F & D w T 1 bid Labor to install 103 HRS 81.00 $8,343 $8,343 Bidders: Quantity Survey: Marker Boards 48'' 1 EA 320.00 $320 $320 60'' 1 EA 400.00 $400 $400 96'' 19 EA 640.00 $12,160 $12,160 120'' 1 EA 800.00 $800 $800 144'' 9 EA 960.00 $8,640 $8,640 Tackboards 24'' 2 EA 120.00 $240 $240 36'' 15 EA 180.00 $2,700 $2,700 48'' 32 EA 240.00 $7,680 $7,680 60'' 8 EA 300.00 $2,400 $2,400 72'' 2 EA 360.00 $720 $720 Map Rail/Tack Strip 477 LF 5.00 $2,385 $2,385 Flag Holder 53 EA 10.00 $530 $530 Map Hooks 240 EA 5.00 $1,200 $1,200 Projection Screens 24 EA 750.00 $18,000 $18,000 Signage Vendor, F & D w T 1 bid Labor to install 62 HRS 81.00 $5,022 $5,022 Bidders: Quantity Survey: Shop 15 EA 25.00 $375 $375 Vendateria 2 EA 15.00 $30 $30 Mezzanine 2 EA 15.00 $30 $30 Storage 4 EA 15.00 $60 $60 Data 2 EA 15.00 $30 $30 Office/Library 1 EA 25.00 $25 $25 Purchasing Office 1 EA 25.00 $25 $25 Office 4 EA 25.00 $100 $100 Janitor 5 EA 15.00 $75 $75 Copy 2 EA 15.00 $30 $30 Men 4 EA 15.00 $60 $60 Women 4 EA 15.00 $60 $60 Mechanical Room 2 EA 15.00 $30 $30 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 26 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 27 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls Job Search 1 EA 25.00 $25 $25 Receiving 2 EA 15.00 $30 $30 Lecture 3 EA 25.00 $75 $75 Elevator Machine Room 1 EA 15.00 $15 $15 Admission 2 EA 15.00 $30 $30 Restroom 4 EA 15.00 $60 $60 Conference 2 EA 15.00 $30 $30 Staff Lounge 2 EA 15.00 $30 $30 Large Group Room 2 EA 15.00 $30 $30 Classroom XXX 11 EA 25.00 $275 $275 Faculty Offices 1 EA 15.00 $15 $15 Conference 1 EA 15.00 $15 $15 Student Store 1 EA 15.00 $15 $15 Testing 2 EA 15.00 $30 $30 Copy/Mail 1 EA 15.00 $15 $15 Student Services 1 EA 15.00 $15 $15 Financial Assistance 1 EA 15.00 $15 $15 Office 18 EA 25.00 $450 $450 Storage 5 EA 15.00 $75 $75 Server 1 EA 15.00 $15 $15 Addendum #1 Building Lettering 12'' High 25 EA 50.00 $1,250 $1,250 11000 EQUIPMENT $49,349 Roof Scuttle Vendor, F & D w T 1 bid Labor to install HRS 81.00 Bidders: Quantity Survey: In Roofing Microwave Shelves Vendor, F & D w T 1 bid Labor to install HRS 81.00 Bidders: Quantity Survey: In Cabinetry Recessed Display Case Vendor, F & D w T 1 bid Labor to install 8 HRS 81.00 $648 $648 Bidders: General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 27 of 47 UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Construction Estimate Sample – Marlin Buckley, PC --- Page 28 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Quantity Survey: A104 Recessed Display Case 1 EA 2,500.00 $2,500 $2,500 Metal Mail Organizer Vendor, F & D w T 1 bid Labor to install 4 HRS 81.00 $324 $324 Bidders: Quantity Survey: A107 Metal Mail Organizer 1 EA 500.00 $500 $500 Metal Lockers Vendor, F & D w T 1 bid Labor to install 139 HRS 81.00 $11,259 $11,259 Bidders: Quantity Survey: A103 New Metal Lockers 139 EA 200.00 $27,800 $27,800 Relocate Existing Metal Lockers Vendor, F & D w T 1 bid Labor to install 78 HRS 81.00 $6,318 $6,318 Bidders: Quantity Survey: A104 Relocate Existing Metal Lockers 78 EA General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 28 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 29 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY 12000 Plastic Laminate Casework Subcontract 1 bid Bidders: Quantity Survey: In Cabinetry 13000 Manufactured Metal Building $1,724,369 Subcontract 1 bid Bidders: Quantity Survey: Base Metal Building 44564 SF 18.48 $823,543 $823,543 Door Openings Framing 6 EA 504.00 $3,024 $3,024 Window Openings Framing 61 EA 511.00 $31,171 $31,171 OH Door Size Opening Framing 25 EA 1,029.00 $25,725 $25,725 L1 Louver 13 EA 1,500.00 $19,500 $19,500 P1 Window 25 EA 250.00 $6,250 $6,250 P2 Window 65 EA 300.00 $19,500 $19,500 P3 Window 29 EA 300.00 $8,700 $8,700 HM Door 7 EA 150.00 $1,050 $1,050 Single HM Frame 5 EA 150.00 $750 $750 Double HM Frame 1 EA 175.00 $175 $175 Hardware 7 EA 200.00 $1,400 $1,400 Roof 45496 SF 8.26 $375,797 $375,797 Siding 23150 SF 5.97 $138,206 $138,206 Insulation R-20 23150 SF 2.52 $58,338 $58,338 R-30 45496 SF 3.78 $171,975 $171,975 Gutter & Spouting Gutter 718 SF 12.25 $8,796 $8,796 Spouting 456 SF 12.25 $5,586 $5,586 Mezzanines T125 836 SF 18.48 $15,449 $15,449 T125 Stairs 1 EA 2,500.00 $2,500 $2,500 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 29 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 30 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY T129 240 SF 18.48 $4,435 $4,435 T129 Stairs 1 EA 2,500.00 $2,500 $2,500 14000 ELEVATORS $50,000 Subcontract 1 bid Bidders: Quantity Survey: Elevator 2 ST 25,000.00 $50,000 $50,000 15300 FIRE SPRINKLERS $194,200 Subcontract 1 bid Bidders: Quantity Survey: Control Valve Assemblies 2 EA 6,000.00 $12,000 $12,000 Sprinkler Piping 91100 SF 2.00 $182,200 $182,200 Service is included under site utilities 15400 PLUMBING $665,053 Subcontract 1 bid Bidders: Quantity Survey: Roof Drains: 6 inch Roof Drain 2 EA 953.00 $1,906 $1,906 4 inch Roof Drain 4 EA 612.00 $2,448 $2,448 8 inch Cast Iron Pipe with Fittings 160 LF 36.00 $5,760 $5,760 6 inch Cast Iron Pipe with Fittings 100 LF 23.00 $2,300 $2,300 8 inch Fiberglass Insulation 40 LF 50.00 $2,000 $2,000 6 inch Fiberglass Insulation 80 LF 43.00 $3,440 $3,440 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 30 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 31 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Plumber Labor 60 HRS 96.00 $5,760 $5,760 Fixtures: Water Closet 56 EA 616.00 $34,496 $34,496 Water Closet Handicapped 24 EA 665.00 $15,960 $15,960 Lavatory 44 EA 140.00 $6,160 $6,160 Lavatory Handicapped 24 EA 504.00 $12,096 $12,096 Urinal 12 EA 727.00 $8,724 $8,724 Urinal Handicapped 7 EA 727.00 $5,089 $5,089 Mop Sink 7 EA 552.00 $3,864 $3,864 Floor Drain Type A 5 EA 173.00 $865 $865 Floor Drain Type B 15 EA 173.00 $2,595 $2,595 Wall sink 23 EA 250.00 $5,750 $5,750 Electric Water Cooler 3 EA 550.00 $1,650 $1,650 Electric Water Cooler Handicapped (Hi/Lo) 7 EA 690.00 $4,830 $4,830 Plumber Labor (227 Fixtures 8Hrs ea) 1816 HRS 96.00 $174,336 $174,336 Drain,Waste & Vent Piping: 8 inch Cast Iron Pipe with Fittings 670 LF 36.00 $24,120 $24,120 6 inch Cast Iron Pipe with Fittings 330 LF 23.00 $7,590 $7,590 4 inch Cast Iron Pipe with Fittings 724 LF 13.00 $9,412 $9,412 3 inch Cast Iron Pipe with Fittings 787 LF 11.00 $8,657 $8,657 2 inch Cast Iron Pipe with Fittings 436 LF 10.00 $4,360 $4,360 11/4 inch Type DWV Copper with Fittings 640 LF 7.75 $4,960 $4,960 Plumber Labor 1065 HRS 96.00 $102,240 $102,240 Crushed Stone 50 TN 19.00 $950 $950 Backhoe with Operating Engineer 10 DAY 1,000.00 $10,000 $10,000 Dumptruck with Driver 10 DAY 650.00 $6,500 $6,500 Domestic Water Distribution: 21/2 inch Type "L" Copper Tubing with Fittings 25 LF 23.00 $575 $575 2 inch Type "L" Copper Tubing with Fittings 575 LF 17.00 $9,775 $9,775 11/2 inch Type "L" Copper Tubing with Fittings 90 LF 14.00 $1,260 $1,260 11/4 inch Type "L" CopperTubing with Fittings 580 LF 13.00 $7,540 $7,540 1 inch Type "L" Copper Tubing with Fittings 365 LF 8.50 $3,103 $3,103 3/4 inch Type "L" Copper Tubing with Fittings 1207 LF 5.50 $6,639 $6,639 1/2 inch Type "L" Copper Tubing with Fittings 290 LF 4.50 $1,305 $1,305 Back Flow Preventer 1 EA 1,519.00 $1,519 $1,519 Pressure Reducing Valve 1 EA 542.00 $542 $542 Hot Water Heater Electric 71Gal 1 EA 6,471.00 $6,471 $6,471 Hot Water Pump 1 EA 1,500.00 $1,500 $1,500 Storage Tank 100Gal 1 EA 450.00 $450 $450 Plumber Labor 540 HRS 96.00 $51,840 $51,840 21/2 inch Fiberglass Insulation Subcontract 25 LF 17.50 $438 $438 2 inch Fiberglass Insulation Subcontract 575 LF 16.00 $9,200 $9,200 11/2 inch Fiberglass Insulation Subcontract 90 LF 14.00 $1,260 $1,260 11/4 inch Fiberglass Insulation Subcontract 580 LF 12.00 $6,960 $6,960 Gas Piping: 6 inch Schedule 40 Black Steel Pipe with Fittings 430 LF 52.00 $22,360 $22,360 4 inch Schedule 40 Black Steel Pipe with Fittings 125 LF 29.00 $3,625 $3,625 3 inch Schedule 40 Black Steel Pipe with Fittings 270 LF 21.00 $5,670 $5,670 21/2 inch Schedule 40 Black Steel Pipe with Fittings 50 LF 20.00 $1,000 $1,000 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 31 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 32 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY 11/4 inch Schedule 40 Black Steel Pipe with Fittings 50 LF 7.00 $350 $350 Connections 6 EA 200.00 $1,200 $1,200 Plumber Labor 240 HRS 96.00 $23,040 $23,040 Compressed Air: 11/4 inch Schedule 40 Black Steel Pipe with Fittings 30 LF 7.00 $210 $210 1 inch Schedule 40 black Steel Pipe with Fittings 50 LF 6.00 $300 $300 Compressor 1 EA 2,500.00 $2,500 $2,500 Plumber Labor 32 HRS 96.00 $3,072 $3,072 Elevator Pit: Sump Pump with controls 1 EA 2,500.00 $2,500 $2,500 Plumber Labor 8 HRS 96.00 $768 $768 Addendum #5: Fuel Oil Tank, double wall 1 LS 500.00 $500 $500 Concrete pad for tank with weatherproof cover 1 LS 1,500.00 $1,500 $1,500 Fuel Oil Pump, 1/3 HP 1 EA 300.00 $300 $300 1/2 inch Schedule 40 Black Steep Pipe with Fittings 40 LF 5.50 $220 $220 1 inch Schedule 40 black Steel Pipe with Fittings 40 LF 7.50 $300 $300 Plumber Labor 24 HRS 96.00 $2,304 $2,304 Plumbing Permit 1 LS $4,140 $4,140 15500 HVAC $2,478,314 Subcontract 1 bid Bidders: Quantity Survey: Equipment: Energy Recovery Unit 20HP 1 EA 27,590.00 $27,590 $27,590 Energy Recovery Unit 25HP 1 EA 33,635.00 $33,635 $33,635 Cooling Tower Tons 455 1 EA 62,620.00 $62,620 $62,620 Water Chiller Tons 450 1 EA 220,100.00 $220,100 $220,100 Exhaust Fan 3PH 2 EA 11,678.00 $23,356 $23,356 Exhaust Fan 1PH 13 EA 5,270.00 $68,510 $68,510 Supply Fan 3PH 1 EA 11,678.00 $11,678 $11,678 Supply Fan 1PH 2 EA 5,270.00 $10,540 $10,540 Condenser Water Pump 60HP 1 EA 41,385.00 $41,385 $41,385 Chiller Water Pump 40HP 1 EA 22,630.00 $22,630 $22,630 Hot Water Pump 25HP 1 EA 22,630.00 $22,630 $22,630 Cabinet Unit Heater 2 EA 2,480.00 $4,960 $4,960 Air Cooled Condensing Unit Tons 3 1 EA 4,500.00 $4,500 $4,500 Air Cooled Condensing Unit Tons 1.5 4 EA 3,500.00 $14,000 $14,000 Split System Air Conditioning Unit 5 EA 4,500.00 $22,500 $22,500 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 32 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 33 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Unit Heater 6 EA 2,500.00 $15,000 $15,000 Gas Boiler (Ability to change to oil) 2 EA 104,625.00 $209,250 $209,250 Burner Gas/Oil 2 EA 10,540.00 $21,080 $21,080 Fin Tube Radiation 8FT 1 EA 415.00 $415 $415 Fin Tube Radiation 7FT 1 EA 363.00 $363 $363 Fin Tube Radiation 6.5FT 1 EA 338.00 $338 $338 Fin Tube Radiation 6FT 1 EA 311.00 $311 $311 Fin Tube Radiation 5.5FT 1 EA 286.00 $286 $286 Relief Air Vent 4 EA 1,309.00 $5,236 $5,236 Blower Coil Unit 2HP 1 EA 1,750.00 $1,750 $1,750 Blower Coil Unit 1.5HP 1 EA 1,500.00 $1,500 $1,500 Blower Coil Unit 1HP 2 EA 1,300.00 $2,600 $2,600 Blower Coil Unit 3/4HP 8 EA 1,250.00 $10,000 $10,000 Blower Coil Unit 1/2HP 39 EA 1,150.00 $44,850 $44,850 Air Handling Unit 7.5HP 3 EA 15,655.00 $46,965 $46,965 Air Handling Unit 5HP 10 EA 10,501.00 $105,010 $105,010 Air Handling Unit 3HP 5 EA 6,277.00 $31,385 $31,385 Air Handling Unit 2HP 1 EA 5,037.00 $5,037 $5,037 Flue Stack 20Dia 20 LF 166.00 $3,320 $3,320 Flue Stack 28Dia 40 LF 329.00 $13,160 $13,160 Expansion Tank Amtrol Model AX100V 1 EA 1,860.00 $1,860 $1,860 5 Gallon Chemical Tank ARC 5 2 EA 527.00 $1,054 $1,054 Air Separator Amtrol Model 6-AS-l 2 EA 450.00 $900 $900 Refrigerant Leak Detector Montor 1 EA 4,000.00 $4,000 $4,000 10 gallon No2 Fuel Oil Storage Tank 2 EA 1,500.00 $3,000 $3,000 Air Curtain 1/2HP 16KW 1 EA 7,905.00 $7,905 $7,905 T-stat 67 EA 125.00 $8,375 $8,375 Sheetmetal Worker Labor 1350 HRS 96.00 $129,600 $129,600 Steamfitter Labor 1350 HRS 96.00 $129,600 $129,600 Rigging and Hoisting 1 LS 5,000.00 $5,000 $5,000 Hydronic Piping: 8 inch Schedule 40 Black Steel Pipe with Fittings 500 LF 65.00 $32,500 $32,500 6 inch Schedule 40 Black Steel Pipe with Fittings 1320 LF 52.00 $68,640 $68,640 4 inch Schedule 40 Black Steel Pipe with Fittings 970 LF 29.00 $28,130 $28,130 3 inch Schedule 40 Black Steel Pipe with Fittings 375 LF 21.00 $7,875 $7,875 21/2 inch Schedule 40 Black Steel Pipe with Fittings 84 LF 20.00 $1,680 $1,680 2 inch Schedule 40 Black Steel Pipe with Fittings 3340 LF 18.00 $60,120 $60,120 11/2 inch Schedule 40 Black Steel Pipe with Fittings 1525 LF 10.00 $15,250 $15,250 11/4 inch Schedule 40 Black Steel Pipe with Fittings 2495 LF 7.00 $17,465 $17,465 1 inch Schedule 40 Black Steel Pipe with Fittings 1890 LF 6.00 $11,340 $11,340 3/4 inch Schedule 40 Black Steel Pipe with Fittings 1200 LF 4.50 $5,400 $5,400 Steamfitter Labor 1200 HRS 96.00 $115,200 $115,200 8 inch Fiberglass Insulation Subcontract 260 LF 50.00 $13,000 $13,000 6 inch Fiberglass Insulation Subcontract 1320 LF 43.00 $56,760 $56,760 4 inch Fiberglass Insulation Subcontract 970 LF 30.00 $29,100 $29,100 3 inch Fiberglass Insulation Subcontract 375 LF 28.00 $10,500 $10,500 21/2 inch Fiberglass Insulation Subcontract 84 LF 21.00 $1,764 $1,764 2 inch Fiberglass Insulation Subcontract 3340 LF 20.00 $66,800 $66,800 11/2 inch Fiberglass Insulation Subcontract 1525 LF 19.00 $28,975 $28,975 11/4 inch Fiberglass Insulation Subcontract 1890 LF 17.50 $33,075 $33,075 1 inch Fiberglass Insulation Subcontract 1200 LF 15.00 $18,000 $18,000 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 33 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 34 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Air Distribution: Sheetmetal, Fabricated and Delivered with Insulatio 21312.5 LBS 5.50 $117,219 $117,219 GRD Damper Assemblies 54 EA 345.00 $18,630 $18,630 Spiral Metal Duct 30 inches Dia 50 LF 48.00 $2,400 $2,400 Spiral Metal Duct 26 inches Dia 150 LF 24.00 $3,600 $3,600 Spiral Metal Duct 20 inches Dia 30 LF 18.00 $540 $540 Spiral Metal Duct 18 inches Dia 70 LF 14.50 $1,015 $1,015 Spiral Metal Duct 16 inches Dia 230 LF 12.00 $2,760 $2,760 Spiral Metal Duct 14 inches Dia 30 LF 10.00 $300 $300 Spiral Metal Duct 12 inches Dia 395 LF 9.50 $3,753 $3,753 Spiral Metal Duct 10 inches Dia 430 LF 8.00 $3,440 $3,440 Spiral Metal Duct 8 inches Dia 600 LF 7.50 $4,500 $4,500 Spiral Metal Duct 6 inches Dia 40 LF 5.00 $200 $200 Exhaust Hood 6ftx3ft 1 EA 400.00 $400 $400 Exhaust Hood 12ftx3ft 1 EA 800.00 $800 $800 Sheetmetal Worker Labor 1200 HRS 96.00 $115,200 $115,200 Building Automation System 91100 SF 2.00 $182,200 $182,200 16000 ELECTRICAL $2,773,039 Subcontract 1 bid Bidders: Quantity Survey: Temporary Supply: Electric 91100 SF 0.25 $22,775 $22,775 Service: 4" PVC Sch 40 Conduit for CATV 650 LF 12.56 $8,164 $8,164 4" PVC Sch 40 Conduit for Phone 1000 LF 12.65 $12,650 $12,650 6'x6'x6' Concrete Precast Manhole Phone 1 EA 2,054.00 $2,054 $2,054 Concrete Precast Manhole PECO 2 EA 2,054.00 $4,108 $4,108 Transformer Concrete Pad 1 EA 2,500.00 $2,500 $2,500 Emergency Generator Concrete Pad 1 EA 3,000.00 $3,000 $3,000 15KV HV Switch Concrete Pad 1 EA 2,500.00 $2,500 $2,500 3 4" Sch 40 Conduit Concrete Encased 1650 LF 24.45 $40,343 $40,343 2 Set 3-15kv#2CU with/100% Concentric Neutral 1100 LF 302.00 $332,200 $332,200 15KV HV Switch Outside 1 EA 31,000.00 $31,000 $31,000 1500/1680 KVA Transformer 55/65 Deg C 1 EA 97,650.00 $97,650 $97,650 10 4" PVC Sch 40 Conduit Concrete Encased 1000 LF 24.45 $24,450 $24,450 8 Set 4#500+3/0GND 960 LF 273.00 $262,080 $262,080 Pull Section 1 EA 1,899.00 $1,899 $1,899 Metering Section with TVSS 1 EA 18,755.00 $18,755 $18,755 2500AMP 480V Distribution Section 1 EA 6,472.00 $6,472 $6,472 150KVAR Auto Power Factor Capacitors 1 EA 5,580.00 $5,580 $5,580 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 34 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 35 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY 112.5KVA Transformer 1 EA 6,587.00 $6,587 $6,587 75KVA Transformer 2 EA 4,960.00 $9,920 $9,920 50KVA Transformer 3 EA 3,294.00 $9,882 $9,882 45KVA Transformer 1 EA 3,294.00 $3,294 $3,294 30KVA Transformer 3 EA 2,752.00 $8,256 $8,256 15KVA Transformer 5 EA 2,325.00 $11,625 $11,625 125KW Diesel Generator with Day Tank 1 EA 46,500.00 $46,500 $46,500 260AMP Transfer Switch 2 EA 8,603.00 $17,206 $17,206 800AMP 480/277V Panel 2 EA 5,348.00 $10,696 $10,696 225AMP 480/277V Panel 7 EA 3,875.00 $27,125 $27,125 100AMP 480/277V Panel 3 EA 2,093.00 $6,279 $6,279 250AMP 208/120V Panel 3 EA 2,596.00 $7,788 $7,788 225AMP 208/120V Panel 13 EA 2,596.00 $33,748 $33,748 100AMP 208/120V Panel 18 EA 1,356.00 $24,408 $24,408 80AMP 208/120V Panel 5 EA 977.00 $4,885 $4,885 Grounding System 1 EA 8,900.00 $8,900 $8,900 Electrician Labor 1200 HRS 99.00 $118,800 $118,800 Rigging and Hoisting 1 LS 5,000.00 $5,000 $5,000 Backhoe with Operating Engineer 10 DAY 1,000.00 $10,000 $10,000 Dumptruck with Driver 10 DAY 650.00 $6,500 $6,500 Panelboard & Equipment Feeders: 600AMP Panel Feeder 250 LF 110.00 $27,500 $27,500 400AMP Panel Feeder 175 LF 55.00 $9,625 $9,625 250AMP Panel Feeder 200 LF 35.00 $7,000 $7,000 225AMP Panel Feeder 900 LF 35.00 $31,500 $31,500 200AMP Panel Feeder 100 LF 30.00 $3,000 $3,000 175AMP Panel Feeder 120 LF 20.00 $2,400 $2,400 150AMP Panel Feeder 350 LF 17.00 $5,950 $5,950 125AMP Panel Feeder 120 LF 13.00 $1,560 $1,560 100AMP Panel Feeder 420 LF 12.00 $5,040 $5,040 30AMP Equipment Feeder 3000 LF 17.00 $51,000 $51,000 20AMP Equipment Feeder 3000 LF 12.00 $36,000 $36,000 Electrician Labor 2000 HRS 99.00 $198,000 $198,000 Fixtures and Devices: First Floor Fixture List 2x4 Type B1,B2,C1 346 EA 112.00 $38,752 $38,752 1X4 Type A2,A3,C2 115 EA 81.00 $9,315 $9,315 1X4 Type A1 230 EA 73.50 $16,905 $16,905 Type EE1 25 EA 125.00 $3,125 $3,125 Type D1 16 EA 85.00 $1,360 $1,360 Type D2 6 EA 85.00 $510 $510 Type G1 10 EA 100.00 $1,000 $1,000 Type N1 6 EA 1,000.00 $6,000 $6,000 Type M1 6 EA 109.00 $654 $654 Type L1 26 EA 291.00 $7,566 $7,566 Type L2 3 EA 291.00 $873 $873 Type L3 4 EA 291.00 $1,164 $1,164 Exit Lights 34 EA 125.00 $4,250 $4,250 Second Floor Fixture List 2x4 Type B1,B2,C1 267 EA 112.00 $29,904 $29,904 2x2 Type B3 2 EA 330.00 $660 $660 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 35 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 36 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY 1x4 Type F1 4 EA 81.00 $324 $324 Type EE1 3 EA 125.00 $375 $375 Type D1 12 EA 85.00 $1,020 $1,020 Type M1 3 EA 109.00 $327 $327 Exit Lights 8 EA 125.00 $1,000 $1,000 Devices 1225 EA 20.00 $24,500 $24,500 Floor Devices 12 EA 250.00 $3,000 $3,000 Wall Switch 105 EA 20.00 $2,100 $2,100 Occupancy Senser Ceiling 68 EA 125.00 $8,500 $8,500 Occupancy Senser Wall 70 EA 125.00 $8,750 $8,750 LCD Ceiling Mounted Projector 16 EA 1,000.00 $16,000 $16,000 Amplifier fo Projector 16 EA 750.00 $12,000 $12,000 Lighting Controller with Relays 18 EA 750.00 $13,500 $13,500 Photocell 1 EA 125.00 $125 $125 Wiremold with 34 outlets 90 LF 25.00 $2,250 $2,250 Emergency Shut-Down Pushbutton 17 EA 250.00 $4,250 $4,250 Electrician Labor 4026 HRS 99.00 $398,574 $398,574 Communications System: Ceiling Mounted Speaker 83 EA 102.00 $8,466 $8,466 Headend Equipment 1 EA 1,500.00 $1,500 $1,500 Phone or Computer Outlets 195 EA 25.00 $4,875 $4,875 T.V. Outlets 4 EA 25.00 $100 $100 Phone Floor Box 3 EA 50.00 $150 $150 Wiremold with 29 Phone Boxes 90 LF 15.00 $1,350 $1,350 12" Cable Tray 453 LF 20.00 $9,060 $9,060 1/4"x2"x24" Ground Copper Bar 3 EA 45.00 $135 $135 4" Conduit Sleeve 2 EA 10.00 $20 $20 3" Conduit Sleeve 4 EA 10.00 $40 $40 8'x4' Plywood for Telephone Rooms 30 EA 75.00 $2,250 $2,250 RG-11 Cable 3000 LF 3.50 $10,500 $10,500 WAP 17 EA 50.00 $850 $850 Electrician Labor 400 HRS 99.00 $39,600 $39,600 Wireless Clock System: Wireless Master Transmitter 1 EA 16,300.00 $16,300 $16,300 GPS Receiver 1 EA 400.00 $400 $400 Wireless Tone Generator 1 EA 400.00 $400 $400 Primex 14480 Software 1 EA 300.00 $300 $300 Clock Mrimex Model 14155 71 EA 125.00 $8,875 $8,875 Clock Mrimex Model 14163 (Trade Work Shops) 27 EA 125.00 $3,375 $3,375 Electrician Labor 140 HRS 99.00 $13,860 $13,860 Fire Alarm System: Main Fire Alarm Panel 1 EA 1,000.00 $1,000 $1,000 Booster Panel 3 EA 1,000.00 $3,000 $3,000 Remote Annunciiator Panel 1 EA 1,000.00 $1,000 $1,000 Horn/Strobe 79 EA 150.00 $11,850 $11,850 Strobe 34 EA 150.00 $5,100 $5,100 Smoke Detector 15 EA 150.00 $2,250 $2,250 Smoke Duct Detector 61 EA 150.00 $9,150 $9,150 Heat Detector 15 EA 150.00 $2,250 $2,250 Pull Station 19 EA 150.00 $2,850 $2,850 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 36 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 37 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY Tamper Switch 5 EA 150.00 $750 $750 Flow Switch 3 EA 150.00 $450 $450 Elevator Recall 3 EA 150.00 $450 $450 Gas Shut Off Valve 2 EA 250.00 $500 $500 Emergency Generator 2 EA 150.00 $300 $300 Testing System 24 HRS 99.00 $2,376 $2,376 Electrician Labor 320 HRS 99.00 $31,680 $31,680 Site Lighting: Fixture Type AA1 7 EA 1,500.00 $10,500 $10,500 Fixture Type BB1 7 EA 1,500.00 $10,500 $10,500 Fixture Type BB2 3 EA 1,500.00 $4,500 $4,500 Fixture Type BB3 6 EA 1,500.00 $9,000 $9,000 Fixture Type DD! 17 EA 495.00 $8,415 $8,415 Sign (by others) 1 EA 500.00 $500 $500 Concrete Base 41 EA 450.00 $18,450 $18,450 1" PVC Sch 40 Conduit with 4#10 2750 LF 21.00 $57,750 $57,750 Photocell 3 EA 125.00 $375 $375 Lighting Controller 2 EA 750.00 $1,500 $1,500 Electrician Labor 160 HRS 99.00 $15,840 $15,840 Backhoe with Operating Engineer 10 DAY 950.00 $9,500 $9,500 Workshop Power: 3P-20AMP CB with NEMA 15-20R 18 EA 350.00 $6,300 $6,300 1P-20AMP CB with NEMA 5-20R 52 EA 250.00 $13,000 $13,000 2P-20AMP CB with NEMA 6-20R 9 EA 250.00 $2,250 $2,250 Loadcenter 12Circuit 120/240V 1PH 3W 6 EA 500.00 $3,000 $3,000 Loadcenter 28Circuit 120/240V 1PH 3W 1 EA 750.00 $750 $750 1P-30AMP Disconnect with 20AMP Fuses 13 EA 250.00 $3,250 $3,250 2P-60AMP CB Disconnect with GFI NEMA 4X Box 19 EA 250.00 $4,750 $4,750 Loadcenter 12Circuit 120/240V 1PH 3W 23 EA 500.00 $11,500 $11,500 3P-30AMP Disconnect with Indicator Light 10 EA 350.00 $3,500 $3,500 2P-30AMP Disconnect with Indicator Light 2 EA 350.00 $700 $700 3P-30AMP Disconnect 1 EA 250.00 $250 $250 2P-30AMP CB Disconnect with Indicator Light 7 EA 350.00 $2,450 $2,450 2P-60AMP CB Disconnect with Indicator Light 4 EA 450.00 $1,800 $1,800 1P-30AMP Disconnect with 20AMP Fuses 2 EA 175.00 $350 $350 2P-30AMP Disconnect with 20AMP Fuses 2 EA 350.00 $700 $700 1P-20AMP Disconnect with 20AMP Fuses 1 EA 250.00 $250 $250 Nema 15-20R 6 EA 100.00 $600 $600 Overhead Door 4 EA 350.00 $1,400 $1,400 Nema L16-20P 480V 3P 1 EA 200.00 $200 $200 Electrician Labor 640 HRS 99.00 $63,360 $63,360 Motor Hoists, installed (4 units total) 1 LS 43,200.00 $43,200 $43,200 (located in Room T116A) Electrical Permit 1 EA 7,500.00 $7,500 $7,500 Underwriter Inspection 1 EA 5,000.00 $5,000 $5,000 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 37 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 38 --- 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL TOTAL BY CSI DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE CATEGORY 1000 GENERAL REQUIREMENTS $502,150 Superintendant (full time) 2080 HRS 85.00 $176,800 $176,800 Project Manager (half time) 1040 HRS 65.00 $67,600 $67,600 General Cleanup Labor (half time) 1040 HRS 65.00 $67,600 $67,600 Job Trailer 12 MOS 500.00 $6,000 $6,000 Cargo Container 12 MOS 200.00 $2,400 $2,400 Portable Toilet 12 MOS 250.00 $3,000 $3,000 Temporary Protection 1 LS 5,000.00 $5,000 $5,000 Temporary Heating 2 MOS 5,000.00 $10,000 $10,000 Temporary Electric & Water 12 MOS 250.00 $3,000 $3,000 Small Tools 12 MOS 250.00 $3,000 $3,000 Project Sign 1 EA 750.00 $750 $750 Dumpsters for General Clean-up 104 EA 600.00 $62,400 $62,400 Temporary Job Fence 1500 LF 4.00 $6,000 $6,000 Printing 1 LS 10,000.00 $10,000 $10,000 Photographs 1 LS 750.00 $750 $750 As-Built Drawings 1 LS 3,500.00 $3,500 $3,500 Final Cleaning 1 LS 15,000.00 $15,000 $15,000 Job Phone and Fax 12 MOS 350.00 $4,200 $4,200 Permits & Permit Expediting 1 LS 45,150.00 $45,150 $45,150 CPM Scheduling 1 LS 5,000.00 $5,000 $5,000 Quality Control & Testing 1 LS 5,000.00 $5,000 $5,000 TOTAL DIRECT COSTS: $16,038,138 $16,038,138 GC FEE: 8.00% $1,283,051 TOTAL BASE ESTIMATE: $17,321,189 BUILDER'S CONTINGENCY: subtotal: $17,321,189 Performance & Payment Bonds: $173,212 1.00% GRAND TOTAL : $17,494,401 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 38 of 47 Construction Estimate Sample – Marlin Buckley, PC --- Page 39 --- Printed: 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls Building Square Footage: 91,100 General Requirements $502,150 $5.51 per SF Site Work $1,844,280 $20.24 per SF Concrete $1,199,410 $13.17 per SF Masonry $522,989 $5.74 per SF Metals $933,478 $10.25 per SF Wood & Plastics $259,333 $2.85 per SF Moisture & Thermal Contro l $409,098 $4.49 per SF Doors, Windows, & Glazing $557,124 $6.12 per SF Finishes $1,735,660 $19.05 per SF Specialties $140,293 $1.54 per SF Equipment $49,349 $0.54 per SF Furnishings $0 $0.00 per SF Special Construction $1,724,369 $18.93 per SF Conveying Systems $50,000 $0.55 per SF Mechanical $3,337,567 $36.64 per SF Electrical $2,773,039 $30.44 per SF TOTAL DIRECT COSTS: $16,038,138 $176.05 per SF GC FEE: $1,283,051 $14.08 per SF TOTAL BASE ESTIMATE: $17,321,189 $190.13 per SF BUILDER'S CONTINGENCY: $0 $0.00 per SF subtotal: $17,321,189 $190.13 per SF Performance & Payment Bonds: $173,212 $1.90 per SF GRAND TOTAL : $17,494,401 $192.04 per SF Square Foot Analysis General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 39 of 47 --- Page 40 --- Printed: 5/4/2009 9:59 AM File: SAMPLE General Construction Estimate 050409..xls General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 40 of 47 Cost Ratio Analysis Electrical 17% Site Work 11% General Requirements 3% Concrete 7% Masonry 3% Metals 6% Wood & Plastics 2% Moisture & Thermal Control 3% Finishes 11% Specialties 1% Equipment 0% Furnishings 0% Mechanical 22% Doors, Windows, & Glazing 3% Conveying Systems 0% Special Construction 11% --- Page 41 --- Printed: 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE Alternate #1: Add Acoustic Ceilings in Trades Rooms T109A 2028 SF 3.00 $6,084 $6,084 T115A 2664 SF 3.00 $7,992 $7,992 T116A 1355 SF 3.00 $4,065 $4,065 T117A 2368 SF 3.00 $7,104 $7,104 T118A 1600 SF 3.00 $4,800 $4,800 T119A 944 SF 3.00 $2,832 $2,832 T120A 1480 SF 3.00 $4,440 $4,440 T121A 1180 SF 3.00 $3,540 $3,540 T122A 2696 SF 3.00 $8,088 $8,088 T123A 1112 SF 3.00 $3,336 $3,336 T126A 2496 SF 3.00 $7,488 $7,488 T128A 2440 SF 3.00 $7,320 $7,320 T131A 2646 SF 3.00 $7,938 $7,938 T133A 2708 SF 3.00 $8,124 $8,124 Subtotal, Costs before General Requirements $83,151 General Requirements $8,315 Subtotal, Bare Cost $91,466 Fee $9,147 TOTAL $100,613 Alternate #2:Add Acoustic Insulation in Trades Wall Types Insulation at Trades 1B 9429 SF 0.35 $3,300 $3,300 2 9692 SF 0.72 $6,978 $6,978 2B 24882 SF 0.72 $17,915 $17,915 2C 29725 SF 0.72 $21,402 $21,402 3 5101 SF 0.35 $1,785 $1,785 3A 1689 SF 0.72 $1,216 $1,216 3B 1268 SF 0.35 $444 $444 1 3800 SF 0.35 $1,330 $1,330 Carpentry Labor 490 HRS 81.00 $39,690 $39,690 Fiberglass Insulation 46597 SF 0.72 $33,550 $33,550 Carpentry Labor 277 HRS 81.00 $22,437 $22,437 Subtotal, Costs before General Requirements $150,048 General Requirements $15,005 Subtotal, Bare Cost $165,052 Fee $16,505 TOTAL $181,557 Alternate #3:Add insulation 1st Fl Admin Wall Types 1 25552 SF 0.35 $8,943 $8,943 1D 126 SF 0.35 $44 $44 3 1624 SF 0.35 $568 $568 Schedule of Alternates 10% 10% 10% 10% General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 41 of 47 --- Page 42 --- Printed: 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE Schedule of Alternates 3A 812 SF 0.72 $585 $585 10 2016 SF 0.72 $1,452 $1,452 11 280 SF 0.35 $98 $98 Carpentry Labor 155 HRS 81.00 $12,555 $12,555 Subtotal, Costs before General Requirements $24,245 General Requirements $2,424 Subtotal, Bare Cost $26,669 Fee $2,667 TOTAL $29,336 Alternate #4:Add Insulation 2nd Fl Admin Wall Types 1 11732 0.35 $4,106 $4,106 1B 1D 1274 0.35 $446 $446 2 84 0.72 $60 $60 2B 3 1946 0.35 $681 $681 3A 210 0.72 $151 $151 3B 588 0.35 $206 $206 Carpentry Labor 80 HRS 81.00 $6,480 $6,480 Subtotal, Costs before General Requirements $12,131 General Requirements $1,213 Subtotal, Bare Cost $13,344 Fee $1,334 TOTAL $14,678 Alternate #5:Add Folding Partition 4/A104 GWB 480 SF 0.65 $312 $312 Steel Studs 120 LF 0.65 $78 $78 Finisher 240 SF 0.60 $144 $144 Carpentry Labor 16 HRS 81.00 $1,296 $1,296 Painting 240 SF 0.60 $144 $144 30X9 Folding Partition 1 EA 20,000.00 $20,000 $20,000 Subtotal, Costs before General Requirements $21,974 General Requirements $2,197 Subtotal, Bare Cost $24,171 Fee $2,417 TOTAL $26,589 Alternate #6:Add GWB above 12' in Trades Wall Types 2B 29172 SF 0.65 $18,962 $18,962 10% 10% 10% 10% 10% 10% General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 42 of 47 --- Page 43 --- Printed: 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE Schedule of Alternates 2C 17425 SF 0.65 $11,326 $11,326 Carpentry Labor 324 HRS 81.00 $26,244 $26,244 Drywall Finishing Subcontractor 46597 SF 0.60 $27,958 $27,958 Painting 46597 SF 0.60 $27,958 $27,958 Subtotal, Costs before General Requirements $112,448 General Requirements $11,245 Subtotal, Bare Cost $123,693 Fee $12,369 TOTAL $136,063 Alternate #7:Add FRP in Corridors FRP 2088 SF 1.45 $3,028 $3,028 Carpentry Labor 24 HRS 81.00 $1,944 $1,944 Subtotal, Costs before General Requirements $4,972 General Requirements $497 Subtotal, Bare Cost $5,469 Fee $547 TOTAL $6,016 Alternate #8:Hardware Schedule #2 Electric Hardware Sets 136 EA 450.00 $61,200 $61,200 Electrical Supplies 136 EA 50.00 $6,800 $6,800 Electrician Labor 272 HRS 99.00 $26,928 $26,928 Subtotal, Costs before General Requirements $94,928 General Requirements $9,493 Subtotal, Bare Cost $104,421 Fee $10,442 TOTAL $114,863 Alternate #9:Add Architectural Landscaping Korean Fire 1 EA 182.00 $182 $182 Drooping Leucothoe 3 EA 182.00 $546 $546 Large Leaf Hosta 22 EA 22.00 $484 $484 Dogwood 5 EA 126.00 $630 $630 Paper Bark Maple 1 EA 182.00 $182 $182 White Pine 9 EA 182.00 $1,638 $1,638 Lambs Ear 70 EA 22.00 $1,540 $1,540 Red Twig Doogwood 32 EA 77.00 $2,464 $2,464 Star Magnolia 3 EA 182.00 $546 $546 Japanese Laurel 4 EA 162.00 $648 $648 Euontmus Japonica 2 EA 185.00 $370 $370 Oak Leaf hydrangea 9 EA 43.00 $387 $387 Blue Lilly Turf 182 EA 18.00 $3,276 $3,276 Paper Birch 5 EA 185.00 $925 $925 10% 10% 10% 10% 10% 10% General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 43 of 47 --- Page 44 --- Printed: 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE Schedule of Alternates Daffodil Bulbs 500 EA 5.00 $2,500 $2,500 Black Eyed Susan 10 EA 18.00 $180 $180 Rhodedendron 13 EA 53.00 $689 $689 Laborer 160 HRS 65.00 $10,400 $10,400 Subtotal, Costs before General Requirements $27,587 General Requirements $2,759 Subtotal, Bare Cost $30,346 Fee $3,035 TOTAL $33,380 Alternate #10:Change to Stylewall II Fluted Deduct Insulated Siding 23150 SF -8.49 ($196,544) ($196,544) Add Stylewall II Fluted 23150 SF 5.97 $138,206 $138,206 Add 9 inch Insulation 23150 SF 2.52 $58,338 $58,338 No savings! Subtotal, Costs before General Requirements General Requirements Subtotal, Bare Cost Fee TOTAL Alternate #11:Delete Translucent Panel P3 Deduct Window P3 29 EA -300.00 ($8,700) ($8,700) Deduct Framing 29 EA -365.00 ($10,585) ($10,585) Add Insulated Siding 1066 SF 8.49 $9,050 $9,050 Subtotal, Costs before General Requirements ($10,235) General Requirements Subtotal, Bare Cost ($10,235) Fee TOTAL ($10,235) Alternate #12:Add Two Floor Drains Floor Drains 2 EA 650.00 $1,300 $1,300 Pipe and Fittings 1 LS 1,000.00 $1,000 $1,000 Plumber Labor 24 HRS 94.00 $2,256 $2,256 Subtotal, Costs before General Requirements $4,556 General Requirements $456 Subtotal, Bare Cost $5,012 10% 10% 10% 10% 10% General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 44 of 47 --- Page 45 --- Printed: 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE Schedule of Alternates Fee $501 TOTAL $5,513 Alternate #13:Hardwired Master Clock Control panel 1 EA 4,500.00 $4,500 $4,500 Wall Clock 98 EA 125.00 $12,250 $12,250 Cable 2000 LF 4.50 $9,000 $9,000 Electrician Labor 160 HRS 99.00 $15,840 $15,840 Subtotal, Costs before General Requirements $41,590 General Requirements $4,159 Subtotal, Bare Cost $45,749 Fee $4,575 TOTAL $50,324 Alternate #14:Add CCTV System Camera Interior 26 EA 745.00 $19,370 $19,370 Camera Exterior Waterproof 20 EA 930.00 $18,600 $18,600 Video Recorder 1 EA 605.00 $605 $605 Monitor 1 EA 605.00 $605 $605 RG-6U Coax Cable 1000 LF 17.50 $17,500 $17,500 Electrician Labor 160 HRS 99.00 $15,840 $15,840 Security System: Security Server Dell 1850 1 EA 4,000.00 $4,000 $4,000 Securtiy Computer Dell Precision 490 1 EA 1,500.00 $1,500 $1,500 Intrusion Detection System: RX Exit Switch 27 EA 60.00 $1,620 $1,620 DC Door Switch 31 EA 60.00 $1,860 $1,860 CR Card Reader 8 EA 517.00 $4,136 $4,136 MD Motion Detector 14 EA 231.00 $3,234 $3,234 Security Keypad 1 EA 1,210.00 $1,210 $1,210 Security Siren 2 EA 148.00 $296 $296 Bosch Security System model D9412G (DAC) 1 EA 5,500.00 $5,500 $5,500 18 AWG CAT 6 Plenum rated cable 2000 LF 17.50 $35,000 $35,000 Electrician Labor 160 HRS 99.00 $15,840 $15,840 Subtotal, Costs before General Requirements $146,716 General Requirements $14,672 Subtotal, Bare Cost $161,388 Fee $16,139 TOTAL $177,526 Alternate #15:Change to Insulated OH Doors OH Coiling Doors with Insulation 3 EA 1,000.00 $3,000 $3,000 10% 10% 10% 10% 10% General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 45 of 47 --- Page 46 --- Printed: 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls UNIT $ PER TOTAL DESCRIPTION QTY MEAS UNIT TOTAL ADJUST ESTIMATE Schedule of Alternates Subtotal, Costs before General Requirements $3,000 General Requirements $300 Subtotal, Bare Cost $3,300 Fee $330 TOTAL $3,630 Alternate #16:Eliminate Motor Hoists (located in Room T116A) Motor Hoists, installed (4 units total) 1 LS -43,200.00 ($43,200) ($43,200) Subtotal, Costs before General Requirements ($43,200) General Requirements Subtotal, Bare Cost ($43,200) Fee TOTAL ($43,200) Alternate #17:Add Roller Shades Roller Shades Windows W1 17 EA 180.00 $3,060 $3,060 W2 12 EA 255.00 $3,060 $3,060 W3 19 EA 360.00 $6,840 $6,840 W4 14 EA 510.00 $7,140 W5 3 EA 180.00 $540 $540 Carpentry Labor 65 HRS 81.00 $5,265 $5,265 Subtotal, Costs before General Requirements $18,765 General Requirements $1,877 Subtotal, Bare Cost $20,642 Fee $2,064 TOTAL $22,706 10% 10% 10% 10% General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 46 of 47 --- Page 47 --- Printed: 5/4/2009 9:59 AM FILE: SAMPLE General Construction Estimate 050409..xls Notes from the Estimator 1 The designation "F&DwT" indicates furnished and delivered with tax. Labor is not included. 2 The designation "F&I" indicates a subcontract item which is furnished and installed. The subcontractor has included the materials sales tax in his price. 3 Labor rates are based upon the Philadelphia Area collective bargaining ageements for wages and benefits scheduled to take effect on May 1, 2006. Line item labor represents a composite direct cost of the ratio of 1 foreman to 3 journeymen, and includes the wages, benefits, and the employer's 4 Labor rates represent the current "buy" rate that a builder would pay specialty subcontractors on an hourly basis. The rates include a reasonable allowance for the subcontractors' overhead and profit. 5 6 7 8 9 10 11 12 13 14 15 General Estimate 12.0 Copyright 2002 Marlin E. Buckley, P.C. Page 47 of 47